sales@jufuwater.com +8618001362005

Iraq Water treatment Project under Construction
The project to improve the drinking water condition of CPF2 camp in Hafaya:
1. water purification system, introducing activated carbon filter + water softener + reverse osmosis process, the produced water reaches the drinking water standard to provide safe water for the camp staff.
2. Sewage treatment system, adopting A2O sewage treatment process to treat the daily life sewage in the camp, and the treated water quality reaches the primary discharge standard.
